Work in emergency mode.

01.12.2018
Работа в режиме ЧС. More than a month, work continued to address the effects of the devastating flood. Element destroyed, auto and railway roads, oil pipeline, electricity and water supply, sewerage. Destroyed and flooded houses and streets.

The quarry team immediately proceeded to liquidate the destruction, first of all, round-the-clock delivery of rubble and rubble was organized to rehabilitate the Russian Railways, Avtodor, Transneft, housing and public utilities facilities, emergency services were housed in the territory, temporary shelter was provided, and street cleaning assistance was provided. Director Kochyan I.A. frank thanks to the labor collective!

Back to the list

FACILITIES:

From the material produced in our quarry were built and reconstructed objects of industrial and civil construction, such as: the Tuapse refinery, M4 Don highway,Dzshubga-Sochi highway, Tuapse-Maykop highway, pipeline Hadizhensk-Tuapse, Shaumyan pass.

Also, bank protection facilities: a railway line Tuapse-Adler. Spray and shore protection: Spray strengthening Geoport Novorossiysk, yacht club "Tornado", bank stabilization beach «Costa Rusa», hotel «Lavicon» p.Nebug and Olympic Park in the city of Sochi.

OUR CLIENTS

Ltd. "SKA"
Ltd. "Gorizont"
Ltd. "TamanNefteGaz""
Ltd. "Stroyportholding"
Ltd. "Dormetal"
Ltd. "Osnova"
"Dagomuskoe DRSU"
Ltd. "Ug-Trans"
Ltd. "Reginzshstroy"
Ltd. "Alfastroy"
Jsc. "Chernomortransneft"
Ltd. "Volgogaz"
"Apsheronskoe DRSU"
"Tuapsinskoe DRSU"