History Of The Quary of Tuapse
In the valley of the river Tuapse rises the picturesque mountain Neveb. From its top one can see a magnificent panorama of the northwestern spurs of the Great Caucasus that holds in its bosom many rich and mysterious resources left from the earth's geological past. As the time goes by, the resources become the property of the science, and the subsoil becomes an indispensable raw material for the creative labor of the builders.
In the seventies of the last century on the slopes of the mountain Neveb Krivenkovskoe limestone deposit began its development. The reserves of the field were discovered back in 1954 - 1962 years, and its industrial development began in 1973 by the Krivenkovskoe gravel plant of the Ministry of Railways of the USSR.
This large production provided North-Caucasian railway with traveling gravel back in those years - up to 65%; with the crushed stone for bank protection works - 100%. The commodity of Krivenkovskoe deposits has built and successfully operated till the present time such strategic objects as the railway Krasnodar - Tuapse, the second way of the railway line Tuapse – Adler.
Since 2002, the mining operations at the mine Krivenkovskoe successfully leads LLC "Surgutzhilstroy" mastering the northern part of the quarry, which has significant reserves - about 7 million cubic meters. of raw materials. Production volumes allow to provide most of the needs of the largest sites of the South of Russia, including the industrial and civil constructions as well as for the sea and river hydro construction.
In 2013, the company successfully conducted technical upgrading. High-tech mining and processing equipment from leading world companies such as: Caterpillar, Hyundai, McCloskey, Powerscreen, Kleemann, were obtained by the facility.
Modernization has allowed the company to significantly increase production, to expand the range and quality performance of the products.