МЕНЮ

News

New bridge

14.06.2018
Новый мост The new crossing will be 2 meters higher than the old one, which will improve the passage of water during the flood.

The bridge is made of asphalt concrete, except for the roadway there are sidewalks for pedestrians. Funds for reconstruction were allocated from the regional budget. During construction, inert materials from the Krivenkovskoye field were used.

Back to the list

FACILITIES:

From the material produced in our quarry were built and reconstructed objects of industrial and civil construction, such as: the Tuapse refinery, M4 Don highway,Dzshubga-Sochi highway, Tuapse-Maykop highway, pipeline Hadizhensk-Tuapse, Shaumyan pass.

Also, bank protection facilities: a railway line Tuapse-Adler. Spray and shore protection: Spray strengthening Geoport Novorossiysk, yacht club "Tornado", bank stabilization beach «Costa Rusa», hotel «Lavicon» p.Nebug and Olympic Park in the city of Sochi.

OUR CLIENTS

Ltd. "SKA"
Ltd. "Gorizont"
Ltd. "TamanNefteGaz""
Ltd. "Stroyportholding"
Ltd. "Dormetal"
Ltd. "Osnova"
"Dagomuskoe DRSU"
Ltd. "Ug-Trans"
Ltd. "Reginzshstroy"
Ltd. "Alfastroy"
Jsc. "Chernomortransneft"
Ltd. "Volgogaz"
"Apsheronskoe DRSU"
"Tuapsinskoe DRSU"