МЕНЮ

News

Producing fraction 80-300 by individual order

29.11.2016
Производство фр. 80-300  по индивидуальному заказу In an ever-changing autumn-winter weather and technical difficulties arise, our professional team managed to extract, process and ship the declared volume of rubble fraction 80 * 300 for the construction of the access road to one of the important facilities of the Krasnodar Territory. <br> Firm-customer expressed gratitude for timely shipment and delivery to the site. Well coordinated work with transport companies also have a positive impact on the timely completion of the object.


Back to the list

FACILITIES:

From the material produced in our quarry were built and reconstructed objects of industrial and civil construction, such as: the Tuapse refinery, M4 Don highway,Dzshubga-Sochi highway, Tuapse-Maykop highway, pipeline Hadizhensk-Tuapse, Shaumyan pass.

Also, bank protection facilities: a railway line Tuapse-Adler. Spray and shore protection: Spray strengthening Geoport Novorossiysk, yacht club "Tornado", bank stabilization beach «Costa Rusa», hotel «Lavicon» p.Nebug and Olympic Park in the city of Sochi.

OUR CLIENTS

Ltd. "SKA"
Ltd. "Gorizont"
Ltd. "TamanNefteGaz""
Ltd. "Stroyportholding"
Ltd. "Dormetal"
Ltd. "Osnova"
"Dagomuskoe DRSU"
Ltd. "Ug-Trans"
Ltd. "Reginzshstroy"
Ltd. "Alfastroy"
Jsc. "Chernomortransneft"
Ltd. "Volgogaz"
"Apsheronskoe DRSU"
"Tuapsinskoe DRSU"