МЕНЮ

News

The first cars reached the customer

02.03.2016
Первые вагоны дошли до заказчика A week after the reconstruction of the freight terminal the first batch of our product has been shipped to the customer. At the same time the loading and weighing floor wagons scheme has been tested, as well as the design of the accounting documentation

Thanks to the coordinated work of our staff and employees of Russian Railways cargo was delivered to the customer on time.

Back to the list

FACILITIES:

From the material produced in our quarry were built and reconstructed objects of industrial and civil construction, such as: the Tuapse refinery, M4 Don highway,Dzshubga-Sochi highway, Tuapse-Maykop highway, pipeline Hadizhensk-Tuapse, Shaumyan pass.

Also, bank protection facilities: a railway line Tuapse-Adler. Spray and shore protection: Spray strengthening Geoport Novorossiysk, yacht club "Tornado", bank stabilization beach «Costa Rusa», hotel «Lavicon» p.Nebug and Olympic Park in the city of Sochi.

OUR CLIENTS

Ltd. "SKA"
Ltd. "Gorizont"
Ltd. "TamanNefteGaz""
Ltd. "Stroyportholding"
Ltd. "Dormetal"
Ltd. "Osnova"
"Dagomuskoe DRSU"
Ltd. "Ug-Trans"
Ltd. "Reginzshstroy"
Ltd. "Alfastroy"
Jsc. "Chernomortransneft"
Ltd. "Volgogaz"
"Apsheronskoe DRSU"
"Tuapsinskoe DRSU"